Plug-in SolarSouth East

Plug-in Solar South East / Questions

Questions people ask us

Short answers to the things we're asked most, with sources.

Planning permission and your surface

Is plug-in solar legal now?

Yes, across Great Britain, from 27 August 2026. The regulations were made on 16 July 2026 and came into force that August. Before then, these panels could not lawfully be sold, supplied or used here, because the electricity safety rules required compliance with a standard that would not let a plug and socket connect generating equipment.

Do I need planning permission?

Usually not, though it is never guaranteed. The panel relies on the existing permitted development right for small scale solar. Meet the conditions and you do not apply. Miss one and you do, and the government expects the fees and paperwork to cost more than the kit saves.

Why does a wooden wall change the answer?

The right was rewritten the same day plug-in solar became legal. The new wording rules out a plug-in installation on a wooden wall, a balcony or timber cladding, stated for houses and for blocks of flats alike. Most of these panels are sold for balconies, so a lot of people get caught out by it.

My home is in a conservation area.

Then a wall facing a highway is off limits, and the same goes inside a World Heritage Site. A listed building's grounds, or a scheduled monument, take you outside the right altogether, whatever else is true of your home. Listed status brings both planning permission and listed building consent into play as well.

How far can it stick out?

No more than 200 mm from a surface that abuts a highway, and no more than 400 mm from any other surface. On a pitched roof it has to sit below the ridge and stand no more than 200 mm proud. On a flat roof the limit is 600 mm above the roof.

What happens after August 2027?

That is when the twelve month changeover ends. Up to 27 August 2027 you can follow either the old rules or the new ones. Beyond that date, the new set is all that is left.

The network operator and the form

Which operator do I tell?

One of two, and your postcode settles it. South Eastern Power Networks plc, part of UK Power Networks, holds the South East England licence area, and Southern Electric Power Distribution plc holds the Southern England area. We treat that as a working map, so check your postcode on the operator's own checker, or ring 105, which is free and connects you to whoever runs your street.

What does telling them involve?

A short online form, completed within 28 days of installation. The government puts it at around five to ten minutes, asking for your name, your email address and the installation address. The form registers that you are using the product rather than applying for anything.

How many panels can one home have?

One. The product specification allows a panel on each final ring circuit, but the network requirements are what actually cap it. G98 Issue 2 Amendment 1 sets that limit at one per household, and it holds until somebody changes it.

Does any of this apply if I rent?

The rules do, and so does your tenancy. Rent or hold a lease and you still need your landlord's or freeholder's consent. The government's response to the consultation names leasehold restrictions, landlord consent and building management as issues the new framework did not solve.

The panel, the socket and what it makes

What are the limits on one of these?

800 VA maximum apparent power to the mains, 3.5 A maximum current, up to 2000 W of PV modules, up to four modules per inverter and no more than two in series in any string. Above 960 W of module capacity, the specification calls for a professional assessment of whether the installation is suitable.

How can I tell a kit has been assessed?

A compliant kit is type tested against G98 and listed on the Energy Networks Association's type test register, with its manufacturer holding confirmation that it was assessed as compliant before going on sale. Not on that register means not through the assessment.

Is an extension lead allowed?

No. Extension cables, multi-way adaptors, RCD adaptors and travel adaptors are all ruled out, and that warning has to be printed on the unit and repeated in the instructions. A socket in the wrong place gets fixed with a socket in the right one.

Does it need an outdoor socket?

Only where the plug and socket will be mounted outside, and then it needs an IP55 rating or better. That is the part an electrician prices.

Will it affect my insurance?

It might. A compliant panel's instructions have to tell you to check, so ring your insurer before it is delivered.

What would one make here?

These figures are modelled at Brighton for one 800 watt panel, with losses set to 14 per cent and no shade. A south facing roof pitch makes 897 kWh a year, a frame on open ground makes 890, a south facing wall makes 645, and an east facing wall makes 424. No UK region beats our roof figure, though it is a ceiling rather than a forecast. What you save depends on how much you are using while the panel is generating, and batteries sit outside the approved kit.

Can I add a battery later?

No, not inside the approved kit. The interim product specification covers neither a standalone battery nor a solar device with storage built in. People who responded to the consultation said this reduces what you get back, but batteries stayed out anyway.

Every answer on this page draws on SI 2026/848, the interim product specification version 2.0 of July 2026, Engineering Recommendation G98 Issue 2 Amendment 1, the Planning Portal guidance on solar equipment, the DESNZ final stage impact assessment, the government response to the consultation, and PVGIS, all read 13 September 2026.

Want us to check your postcode?

Send it with the surface you have in mind and we will do the rest.

  • Kent
  • East Sussex
  • West Sussex
  • Surrey
  • Hampshire
  • Berkshire
  • Oxfordshire
  • Buckinghamshire
  • Isle of Wight

Start with your postcode

Five boxes: name, postcode, email, where the panel would go and what the surface is made of. You get one email back: the rule for your surface, a yearly figure, and which operator you're under.

We reply by email. Your postcode isn't passed to anyone and we don't take commission.